Your local builder.
Browse some pictures of my work.
Triple-glazed windows fitted
August 2013 in Loudwater, Bucks
Conversion underway
Outhouse Conversion Loudwater
Brickwork
Building conservatory extension walls in bricks and slabs
Cementing
Mixed on site
Tiling
Laying hallway tiles in brick formation
Tiling Completed
Tiling finished in hallway
Plastering left to dry
New Windows and French doors visible
Finished Conservatory
Painted green with wall sticker mural
Insulation Installed
Ready for the concrete to be laid
Concrete base
Concrete poured and levelled and left to dry
Waterproofing to soakaway
Lining the groundwork
August 2012
New Conservatory extension
My Van
Perhaps you've spotted me?
